The calculus of project teams

leave a comment »

Introduction

Calculus is an important part of the mathematical toolkit of scientists and engineers. I’m sure some of my readers have (perhaps, not so fond) memories of many (perhaps, not so entertaining) hours spent in learning calculus during their late high-school / early college years. Calculus has two main branches: differential calculus and integral calculus.  The first branch deals with a mathematical technique called differentiation,  which enables one to calculate the variation of a quantity with respect to another  – for example, change of distance with respect to time, aka speed.  The second branch deals with integration, a technique to compute the net (or summed) effect of small variations  – for example, speed*time, summed up over all time slices, yields the total distance travelled.  As the examples suggest, the two techniques are the inversely related. In this post I draw an analogy between these operations of calculus and two somewhat opposite, or inverse, things a project manager has to do in order to ensure the smooth and effective functioning of a team.

Project teams consist of individuals, each with different skills, aptitudes and personalities. Yet the team has to function as a unit, pulling together, ensuring that every individual’s effort contributes to achieving the team goal. In order to do this, the project manager has to employ the inverse techniques of team  differentiation and integration as I outline below.

Differentiation

It’s a given that no two people are the same. Yet many managers deal with all  their team members in exactly the same way. This is a mistake. One has to tailor one’s management approach to suit individual personalities and quirks. But even before this, one has to take the time to understand what makes each individual tick – knowledge, skills, professional interests, approach to work,  career aspirations etc. This isn’t always easy to elicit (no, a questionnaire won’t work!). One has to get to know people one-on-one, taking time to talk to them in different situations and contexts. Over time one builds up a picture of the things that make them different and unique from everyone else on the team.

Why is this important? Well, if you really understand the folks who make up your team, you’ll develop a feeling for what they will be able and willing to do on a project. You’ll get a sense for their strengths and weaknesses, both technical and otherwise. This is knowledge that is useful in all stages of a project, but particularly so in times of crisis.

Differentiation, in essence,  boils down to developing individualised work relationships with each team member.  All the outstanding project managers I have known have been able to do this effortlessly, and in a non-intrusive way. I reckon this (not so common) skill is one of the important factors that sets the brilliant apart from the run-of-the-mill project manager.

A few words of warning though: Although the best way to get to know people is through conversation, remember to be sensitive to differences in personality, and also to avoid topics that may be construed as personal. Further, be genuine – there’s nothing worse than false interest or bonhomie; and it shows a mile away!

Integration

Differentiation is one aspect of team management, the other is integration: i.e.  integrating diverse personalities and skills into a coherent team. Most mainstream theories of team development are built around Tuckman’s four-stage forming-storming-norming-performing model. In brief: the first stage corresponds to team formation; the second to debates / confrontations between individuals on the team; the third to settling down and development of trust; the fourth to working on the task that the team has been charged with. The project manager has a supervisory (I prefer the word, integrative) role in all four phases, but especially so in the first two.

In an ideal situation the project manager has had a chance to get to know team members prior to team formation. If so, through differentiation, he or she already knows the strengths and weaknesses of each individual. The project manager can thus match project requirements to individual skills and aptitudes to come up with an optimal team. Once the team is formed, the project manager can facilitate project discussions, armed with a good sense for who might be able to contribute in specific areas. Furthermore, he or she will also be able to defuse conflicts or mediate disagreements between team members more effectively than would have been the case without this knowledge.

Conclusion

In mathematics differentiation and integration are the basic operations of calculus. In this post, through analogy, I have discussed the importance of the two  techniques in the context of project teams. Much like the engineer who has to master differentiation and integration, the project manager has to be adept at both techniques of the calculus of project teams.

Written by K

September 15, 2008 at 8:35 pm

Blended project teams and client-vendor trust

leave a comment »

Introduction

Many projects are run as collaborative efforts between  customer and provider (or vendor)  organisations. It is well accepted that such co-creation involving both parties is an effective way for service organisations to enhance acceptance of the services they provide. It is a common practice for IT service providers to locate their consultants at client sites for the entire duration of the project. In this period consultants and client-side employees work together in blended teams. It is clear that the (provider-side) project manager plays a critical role in such projects because he or she is at the interface, or boundary, between two organisations. A recent paper, by Sheila Simsarian Webber, entitled, Blending Service Provider – Client Project Teams to Achieve Client Trust: Implications for Project Team Trust, Cohesion and Performance, published in the June 2008 issue of the Project Management Journal, investigates the effectiveness of such teaming from the perspective of trust between the project manager (as a proxy for the supplier) and the client.  I review the paper below.

Background and Objectives

Interestingly, most of the  research on co-creation or co-production has focused on bringing the customer into the service organisation rather than the other way round. That’s strange (to me at any rate) because the latter situation, in which provider-side employees are placed in client organisations, is way more common in IT projects. Placing employees within client organisations gives the service provider ongoing opportunities to understand a client’s business better, and thus foster long-term relationships with them.  However, this works only if there is trust between the two parties.  The project manager (as a proxy for the provider) plays a key role in developing this relationship.   In the paper, the author provides empirical evidence that the use of blended teams creates a more trusting relationship between the client and project manager. Further, the research also shows that gaining the client’s trust has the  side effect of improving (intra-team) team trust, cohesion and performance.

Before proceeding any further, it is worth defining what is meant by trust. Following Mayer, Davis and Schoorman, the author defines interpersonal trust as the willingness of a party to be vulnerable to the actions of another party based on the expectation that the other will perform a particular action important to the trustor, irrespective of the ability to monitor or control that party.  Researchers have identified two dimensions of interpersonal trust: affective and cognitive. The first is based on emotional bonds and the second on notions of reliability, dependability and competence.  Trust among business partners involves both types of trust. In the case at hand, it is important that the client not only believes in the project managers competence, but also that he or she cares about the client’s business (i.e. has an emotional bond with the client). Blended teams provide more opportunity for interaction between the client and provider and hence the basis for the author’s first hypothesis:

Hypothesis 1. Blended project teams will have greater client trust (than non-blended teams).

Katz and Kahn proposed that an organization be considered as an open system that interacts with its environment. If this is so, it is important that boundary relationships  – i.e. relationships at the interface between an organisation and its environment (which could be another organisation) – be managed effectively.  The open system concept has been applied to teams as well. Further, earlier research has demonstrated that managing relationships outside team boundaries is important for knowledge transfer and team success. In the case of project teams, managing external relationships is generally the responsibility of the project manager. In the present case the main external relationship (from the perspective of the provider) is the one between the project manager and the client. Based on research by Amy Edmondson , which suggests that boundary spanning relationships affect team trust, cohesion and effectiveness, the author proposes the following as her second hypothesis:

Hypothesis 2. Client trust in his or her direct project manager will be positively (or directly) related to team trust, cohesion or performance. That is, as client trust (in the PM) increases, so does team trust, cohesion and performance.

Finally, as a follow-on to the second hypothesis, the author suggests a that there is a stronger positive correlation between client trust and team trust, cohesion and performance if the team is blended. This leads to her third hypothesis which is:

Hypothesis 3. The relationship between client trust and team trust, cohesion and performance is stronger when teams are blended (as compared to non-blended teams).

Results and Discussion

The author surveyed 31 IT project teams (20 blended and 11 non-blended). Data was collected from project managers, their primary client contacts and  project teams. Project managers reported on background information, nature and duration of project and whether or not the team was blended; clients were surveyed for an assessment of trust (cognitive and affective); and teams were asked about team trust, cohesion and performance. I won’t discuss specific metrics used by the author – please see the original paper for more on these.

The research results vis-a-vis the above hypotheses can be summarised as follows:

1. Clients tend to have greater (cognitive and affective) trust in project managers who are a part of a blended team.

2.  The client’s cognitive trust in the project manager has significant positive implications for the team’s (internal) cognitive trust and has marginally significant positive implications for the team’s affective trust. Interestingly, the client’s affective trust in the project manager has significant positive implications for the team’s cognitive and affective trust. This seems to suggest that emotional trust between the client and the project manager carries more weight than perceptions relating to competence and reliability.

3. The results around the third hypothesis are even more interesting. The data suggests that there is a relationship  between client trust / team trust, cohesion and performance and whether or not a team is blended. However, this relationship isn’t as hypothesised: it turns out that when the client does not have much cognitive trust in the project manager, a blended team has significantly less cognitive team trust than a non-blended team.  Similar results hold for team performance: when the client does not have much affective trust in the project manager,  a blended team will show significantly lower levels of performance than non-blended teams. Why should this be so? I suggest it is because non-blended teams, due to the lack of interaction between client and provider side team members,  are shielded from the politics of the client-project manager relationship. In blended teams, on the other hand, co-location  of  team members and managers, and the resulting opportunities for informal communication, means that a sour relationship between the client and project manager can quickly translate to breakdown of team relationships.

The results lend empirical backing to the importance of client relationship management for project managers. Specifically, for blended teams, the research shows that trust between the project manager and the client is directly related to  team trust and performance. Furthermore, blended teams tend to be more negatively affected than non-blended teams in cases where the relationship between the project manager and client is not good. This, again, highlights the critical role of client-project manager relationships for blended teams.

Conclusion

Although many of the results discussed in the previous may seem evident to professional project managers who work with blended teams, the research is interesting because it lends empirical support to such “obvious” notions. Having said that, the conclusions drawn by the author should not be overstated, particularly because of the small sample size and limitations imposed by the survey methodology (for example, the data did not capture the nature / scope of the project and other factors which may have an effect on the conclusions). Further, the research does not consider factors such as organisational culture and constraints, which may have a significant effect on the functioning of blended teams and the development of trust between employees from different organisations. In view of these limitations the results can be regarded as suggestive, but by no means definitive. Nevertheless, the paper is of interest to project managers and senior executives who work in service and consulting organisations.

References:

Webber, S.S., Blending Service Provider – Client Project Teams to Achieve Client Trust: Implications for Project Team Trust, Cohesion and Performance, Project Management Journal, 39 (2), 72-81. (2008).

Written by K

September 12, 2008 at 7:55 pm

On the role of processes in project management

with 2 comments

The word process has several different connotations – an online dictionary lists more than twenty meanings of the word. Amongst these, the following is the sense in which the word is used when we speak of a project management process:

Process (noun): a systematic series of actions directed to some end.

The key word here is systematic – which  (again from the same online dictionary) means according to a method. The word process thus has a very precise meaning – a series of methodical actions which are directed to some (definite) end. The word, as used in normal parlance, evokes a  world in which a sequence of well-defined actions lead to certain desired results.  This may be an excellent approximation to reality on the manufacturing shop-floor, but is little more than an illusion in the messy world of projects. Having made a potentially controversial statement, I’d better clarify what I mean. I do so below.

 The objective in manufacturing  is to mass-produce items in a controlled and repeatable manner. In constrast, in projects the aim is to create  unique products (or services).  In the former case, it makes perfect sense to formalise actions required to create the product into well-defined and detailed processes.  Such processes tend to be very prescriptive: e.g. immerse the widget in the solution for 3 minutes, then air dry at 200 C for 2 minutes.  Such prescriptiveness is required for ensuring repeatability (of processes) and reproducibility (of results). It also confers an advantage in quality improvement efforts: such processes can be tweaked in a controlled fashion whilst maintaining a sensible baseline for comparison.  In the  case of projects, though, the notion of a process isn’t quite the same. Given that every project aims to create a one-off, unique product, how does the idea of “systematic actions directed to an end” apply? I take a brief look at some half-answers below.

 Wikipedia defines a project management process as a management process of planning and controlling the performance or execution of a project.  The definition isn’t much help, so let us start with a commonly accepted example of a project management process instead: schedule development or scheduling  (as per PMI or PRINCE2).   Now,  although schedule development has a bunch of inputs, tools and techniques, and outputs,  these leave much open to interpretation.  That is, they aren’t as prescriptive as processes in manufacturing. They don’t even come close to being “a systematic series of actions directed to some end.” Yet, they are often considered by project managers as being so. That, in my opinion, is the problem. Let me hasten to add that frameworks and methodologies aren’t at fault here – most do emphasise that they provide guidelines not recipes. As I have mentioned in an earlier post, this is largely a problem of our own making. To paraphrase the Bard: The fault, dear Brutus, is not in our processes, But in ourselves, that we are obsessed with them.

The history of project management yields a clue as to why the notion of process – despite its shortcomings – is so ingrained in  project management theory and practice.  As Patrick Weaver points out, the roots of modern project management lie in concepts of scientific management, or Taylorism as it is called after its founder, Fredrick Taylor. To quote Weaver, “…Project management has evolved in its specialist area along very similar lines to general management theory. In early days, project management closely mirrored the classical school of management with a focus on scientific processes…”  Why this early focus on scientific processes? Well, Weaver mentions that, “…it is entirely reasonable to argue that the evolution of modern project management is a direct consequence of the need for professional schedulers for a forum to discuss and develop their new discipline….” Since scheduling is arguably the most mathematical (or statistical) process in the project management process pantheon, the focus on scientific management is really no surprise.

In recent years things have moved on. In their paper on future challenges and opportunities in project management (which I have reviewed in an earlier post), Shenhar and Dvir point out that there are three central paradigms of project management: operational/process, team/leadership and business/strategic. The process-based approach, rooted in scientific management, corresponds to the first. The team/leadership view puts people at the centre of focus, and as we all (should!) know, people aren’t as simple as processes.  The last perspective is the big-picture: project management as a strategic tool. As is the case with people, this too cannot be reduced to formulaic processes. The fact that the latter two perspectives have been getting more attention in recent years indicates that things are changing. So, perhaps it is only a matter of time before the practice of project management is cured of its process obsession.

Related posts:

The means, not the end.

A PERT myth

Blinded by the light: when project management methodology matters more than project success.