An ABSERD incident – a service desk satire

with 4 comments

The expenses application crashed just as Tina had finished entering the last line. She wasn’t duly alarmed; this had happened to her a couple of times before, but Nathan in IT was able to sort it out without her having to reenter her expenses.

She dialled his number, he answered in a couple of rings. After a brief exchange of pleasantries, she described the problem.

To her surprise, he replied, “I’m sorry Tina, I can’t help you. You will have to call the service desk.”

“The service desk?”  She asked, “What’s that?”

“We have streamlined our IT service procedures to comply with the ABSERD standard –  which stands for  Absolutely Brilliant SERvice Desks. It is an ABSERD requirement that all service calls must be routed through a centralised service desk.”  explained Nate. “The procedures and the numbers you need to call were in the email that was sent out to everyone last week.”

“Yes, I read it, but I didn’t think the ABSERD procedures applied to something like the expenses app.,” said Tina, somewhat bemused.

“I’m afraid it applies to all services that IT offers,” said Nate.

“But isn’t the service desk located elsewhere? Will they even know what the expenses app is let alone how to fix it?”

“Ummm…they’ll fix it if they can and escalate it to the next level if they can’t,” replied Nate. “The ABSERD processes are detailed in the email,” he explained again helpfully.

“You know what the problem is.  Tell me honestly: do you think they’ll be able to fix it?”

“Probably not,” admitted Nate.

“So they’ll escalate it. How long will that take?”

“The ABSERD service level agreement specifies that all non-critical issues will be responded to within   48 hours. I’m afraid the expenses app is classified as non-critical.”

“So that’s 48 hours to fix an issue that you could sort out in minutes,” stated Tina in a matter of fact tone.

“Ummm…no, it’s 48 hours to respond.  That’s the time frame in which they will fix the issue if they can or escalate it if they can’t fix it. As I mentioned, in this case they’ll probably have to escalate” clarified Nate.

“You mean they’ll take 48 hours to figure out they can’t do it. Now, that is truly absurd!”   Tina was seriously annoyed now.

“Well, the service desk deals with calls from the entire organisation. They have to prioritise them somehow and this is the fairest way to do it,” said Nate defensively. “Moreover, the service level agreement specifies 48 hours, but there’s a good chance you’ll get a response within a day,” he added in an attempt to placate her.

“And who will they escalate the call to after 48 (or 24) hours if they can’t fix it?” asked Tina exasperatedly.

“Ummm….that would be me,” said Nate sheepishly.

“I’m sorry, but I’m totally lost now. By your own admission, you’ll probably be the one to fix this problem. So why can’t you just do it for me?”

“I’d love to, Tina” said Nate, “but I can’t.  Jim will have my hide if he knows that I have bypassed the ABSERD process. I’m sorry, you’re just going to have to call or email the service desk. I can’t do anything about it”

“Why are we suddenly following this ABSERD process anyway? What’s the aim of it all?” asked Tina.

“Well, our aim is to improve the quality of our service. The ABSERD standard is a best practice for IT service providers…,” he trailed off, realising that he sounded like a commercial for ABSERDity.

“You do agree that it actually increases the service time for me. You could have fixed the issue for me in the time we’ve had this conversation but I’m going to have to wait at least 24 hours. I fail to see what has “improved” here.”

“Look, this is the new process. I’m sorry can’t do anything about it,” said Nate lamely.

“OK, I’ll log the call.” she said resignedly.

“I’m sorry, Tina. I really am.”

“It’s not your fault,” she said in a gentler tone, “but I’m probably going to miss the deadline for getting my expenses in this month.”

“Tell you what,” said Nate, as the obvious solution dawned on him, “I’ll fix the problem now… but please log the call just in case someone checks.”

“Are you sure you can do that?” asked Tina. “It would be nice to get reimbursed this month, but I do not want you to get into trouble.”

“It shouldn’t be a problem as long as you don’t tell anyone about it…I wouldn’t want to make it known that I bypass the ABSERD procedures as a matter of course.”

“My lips are sealed,” said Tina. “Thanks Nate, I really appreciate your help with this.”

“No worries Tina. I’ll call you when it’s done,” he said as he ended the call.

Written by K

October 17, 2013 at 8:06 pm

Dark clouds, silver linings: a transaction cost perspective on the outsourcing of information systems

with 3 comments

Introduction

Some years ago, I wrote a post applying ideas of transaction cost economics to the question of outsourcing IT development work.  In that post I argued that evaluating costs on the basis of vendor quotes alone is highly misleading. One has to also factor in transaction costs – i.e. costs relating to things such as search, bargaining and contract enforcement.

In the present post I discuss transaction cost theory as it applies to the question of whether or not organisations should outsource their enterprise systems (such as ERP and CRM applications) to Software as a Service (SaaS) vendor. With the increasing number of offerings on the market, this issue is one that is high on the agenda of IT decision makers.

To be sure, there are many well-known (and massively hyped!) benefits of cloud-based solutions. To name just one: organisations that take the SaaS route do not have to worry about maintenance, upgrades etc. as these are handled by the vendor. As we shall see, however, when it comes to costs, things are not so clear.

Setting the context

Today’s IT landscape is considerably more complex than that of a couple of decades ago. Improvements in infrastructural technology now offer the IT decision maker choices that were simply not available then.  One of the basic choices a decision maker is faced when implementing a new enterprise system is whether to develop (or customize), host and support it in-house or opt for a cloud-based offering. Most often decisions on these matters are made on the basis of vendor-quoted costs alone. A typical discussion between a supporter and skeptic of outsourcing may go as follows:

Supporter: We should outsource our CRM system because we will save costs. We can save X million dollars on licensing and hardware…and then there are potential savings on personnel costs in the longer term.

Skeptic: Yes, but we lose flexibility to modify the application to suit our needs.

Supporter:  Flexibility is overrated. We have done a gap-fit analysis and have found that most of core business needs can be satisfied by the three shortlisted cloud offerings. We are not a complex business:  we call on customers, sell them our product and then follow-up from time to time to see how they are going and whether there are potential opportunities to sell them upgrades. It’s pretty much what everyone else in the business does.

Skeptic: What about vendor lock-in?

Supporter: There is no lock in we pay as we go; per user per month.

….and so the conversation goes. The supporter seems to have an answer for every question so the skeptic may eventually concede. However, the latter may still be left with a vague sense of unease that something’s been overlooked, and indeed something has…which brings us to the next topic.

Transaction costs

A firm has two choices for any economic activity: performing the activity in-house or going to market. In either case, the cost of the activity can be decomposed into:

  1. Production costs, which are direct (easily quantifiable) costs of producing the good or service
  2. Transaction costs, which are other (indirect) costs incurred in performing the economic activity.

Production costs include things such as per user cost etc. These are typically quoted upfront and are easy to contractualise (i.e. put into a contract).  Things are more complicated when it comes to transactions costs. To see this, let’s take a quick look at the different types of transaction costs:

  1. Search /selection costs: These are the costs associated with searching for and shortlisting vendors.
  2. Bargaining costs: These are costs associated with negotiations for a mutually acceptable contract.
  3. Maintenance costs: These are expected costs (i.e. those that were foreseen when the contract drawn up) associated with ongoing support, enhancements or upgrades.
  4. Costs of enforcement and change: These are costs associated with enforcing the terms of the contract and those associated with change.

These costs are typically hard to estimate upfront, and nearly impossible to contractualise. Moreover, in most cases, they are largely borne by the client.

Dark clouds

The difficulties associated with contractualising transaction costs arise from the following:

  1. Unexpected events: Unforeseen and unforeseeable changes in the customer / vendor organisations or in the business environment may entail major changes in the application functionality or even the outsourcing arrangement.
  2. Bounded rationality:  Business environments are complex and it is impossible for the human mind to anticipate everything that can possibly occur. As a consequence,  every contract is necessarily incomplete; there is bound to be something that is overlooked. It is impossible contractualise every eventuality.
  3. Strategic / opportunistic behaviour: the vendor or customer may deliberately withold certain information from the other party  at the outset in order to secure the contract at a favourable rate. Typical vendor behaviour may include not revealing certain limitations of the software on the other hand, the customer may attempt to include unfair penalty clauses into the contract or squeeze the vendor on margins.

Now before I’m accused of being unduly alarmist I should mention that certain kinds of enterprise systems are not subject to the above difficulties, or at least not significantly.  Typically these are infrastructural services such as servers, operating systems, databases and even simple, context-independent applications such as email.  These can be outsourced successfully without any problems because the services to be provided can be specified accurately upfront and thus contractualised unambiguously.

However, for enterprise applications such as ERP and CRM the situation is different because these systems are more or less unique to a given organisation – in other words, they are context-dependent.  Their uniqueness renders them vulnerable to the points mentioned above because it is impossible to foresee all possibilities. As a consequence it is inevitable that any outsourcing deal involving such systems will eventually be affected by one or more of the above uncertainties.

Silver linings

None of the above points is new: both vendors and customers are at least somewhat aware that application outsourcing deals have many unknowns. Consequently, both parties try to minimise their exposure to uncertainty. Unfortunately,  they usually go about this in exactly the wrong way:  they attempt to build safety for themselves at the cost of the other party. They do this by attempting to contractualise all possible things that can go wrong from their point of view. This is impossible because the future cannot be predicted.  Contracts, however detailed, will necessarily be incomplete.

The way out is simple. As Oliver Williamson, winner of the 2009 Economics Nobel Prize, tells us:

…important to the transaction-cost economics enterprise is the assumption that contracts, albeit incomplete, are interpreted in a farsighted manner, according to which economic actors look ahead, perceive potential hazards and embed transactions in governance structures that have hazard-mitigating purpose and effect. Also, most of the governance action works through private ordering with courts being reserved for purposes of ultimate appeal.

As he tells us, contracts need to be interpreted in a farsighted manner and governance action should work through private ordering (directly between the customer and vendor). Essentially, the success of an outsourcing deal is to a large extent the joint responsibility of the customer and vendor. Above all, it calls for a relationship based on old-fashioned notion of trust.

Interestingly, Elinor Ostrom, who jointly won the 2009 Economics Nobel with Williamson, had much to say about informal contracts, private ordering and trust.  Her extensive studies on collectives lead her to conclude that successful collective endeavours have the following two elements in common:

  1. High levels of face-to-face communication
  2. Innovative governance structures that are designed and enforced by the participants rather than external authorities.

The relevance of these to an outsourcing arrangement is clear: face to face communication builds trust, and innovative internal governance structures that are enforceable without legal recourse will discourage opportunistic behaviour from both parties. Although the latter may sound a bit utopian there are proven ways to set up such governance structures (see this paper for an example).

Conclusion

In this post I have argued that a proper analysis of SaaS deals must include transaction costs.  Although these are difficult to quantify, a consideration of the different categories of transaction costs will at least lead to a more realistic appraisal of such arrangements.  It is my belief that many outsourcing deals go sour because transaction costs are overlooked.  Given that it is impossible to foresee the future, the best course of action is to develop a business relationship that is based on trust.

To sum up:  most important factor in enterprise application outsourcing is not cost, but trust an ineffable element that can neither be quantified nor contractualised.

Written by K

October 2, 2013 at 9:35 pm

What project management means to me – a metalogue

with 22 comments

Salviati: Hello Simplicio, I haven’t seen you for a while. Where have you been?

Simplicio: Salviati!  It is good to see you.  I’ve been busy learning about project management.

Salviati: That is good news indeed, Simplicio.  How are you learning? Are you working on a project?

Simplicio: No, of course not; I’m still learning. I don’t think  my boss would let me work on a real project until I’ve completed my certification.

Salviati: Certification? Now I’m really curious.

Simplicio: Oh yes, and as a part of it I’m reading this wonderful book that is the authoritative guide to project management. I’m also attending an  evening discussion group twice a week where I get to  explore the finer details of “The Book”. It’s great! We have some experienced project managers in the group who tell us stories.

Salviati:  That’s good, and I would pay more attention to their stories than the tools and techniques in “The Book”.

Simplicio: Really? Why would I want to listen to a bunch of stories about old projects? Surely it’s the tools and techniques that are more important. Stories are….well, just stories.  Half of them are probably embellished anyway.

Salviati:  May be so, but the fact is, project managers often make sense of their work by constructing stories about it.

Simplicio: What do you mean “make sense of their work?”

Salviati:  Well, despite project managers’ best efforts, things never quite go as planned: team members fall sick or leave the company; vendors do not deliver on time; users change their requirements on a daily basis…I could go on.  When these things happen, project managers need to  understand  what has happened so that they can devise appropriate responses.   They often do this by building narratives of what happened or, in simple terms, by telling stories.

Simplicio: To be perfectly honest I think the real reason things go wrong is that people  do not   follow processes properly. It seems to me that storytelling is just a means to cover up the truth, a rationalisation.

Salviati: Ah, truth. You see, Simplicio, truth in such situations is often a matter of opinion. Different stakeholders will have different views on what happened. Say a vendor is late in delivering something – the customer may see it as gross incompetence whereas the vendor will, no doubt, have a perfectly reasonable explanation. So, whose truth is the truth?  And even if you were able to answer that, does it really matter? As a project manager, you’re on the spot; you have to move ahead despite the setback. The truth doesn’t help you here, and neither does process. In fact trying to get to the truth and insisting on process may only end up exacerbating the problem.

Simplicio: Hmm, OK, you may have a point there, but are you suggesting there is nothing of value in “The Book?” Is it all just impractical theory?

Salviati:  Oh don’t get me wrong, it is necessary to know the stuff in that’s in “The Book”. But it is also important to remember that there is a gap between theory and practice.

Simplicio:  Gap between theory and practice?

Salviati:  Yes there is a significant gap between what is taught in business schools (or written in “The Book”) and the way managers actually do their jobs. The former is called espoused theory and the latter, theory in use (Editor’s note: see this article for more on espoused theory vs theory in use). Espoused theory works in an ideal world where cause-effect relationships are unambiguous, and uncertainty can be predicted and planned for. This is the sort of world that is depicted in those pretty process diagrams that people draw on a whiteboard. In the real world, however, causes aren’t always apparent and best laid plans often go awry. Managers have to deal with this. When doing so, they often improvise on what they have learnt through experience. What books and project theorists tend to overlook is that planning and improvisation are complementary facets of project work. Indeed the most compelling project management stories are about improvisation; about what people did when theory or process was no help at all.

Simplicio:  So you’re saying that theory is incomplete…

Salviati:   Absolutely! Theory cannot teach you what experience does. You see, many project management skills are tacit, they can only be learned by doing. Would you pick up a book about guitar and music theory and expect to play like a virtuoso in an afternoon… or even a month or a year?  .  So it is with project management.   But, look,  tacitness is not the only issue. Another major shortcoming of project management, as it is taught, is that it overlooks the fact that every project is invariably part of a larger system: namely, the hosting organisation and its environment. Understanding this is critical to the success of a project.

Simplicio:  I’m not sure I understand  what you mean by “a larger system”.

Salviati: Consider  the question of project failure. Many experts will tell you that the top causes of project failure are things like “lack of executive support” or “lack of user input” or even “incomplete requirements.” What these experts do not understand is that these are  symptoms rather than causes.  The true causes of failure invariably lie in the hosting organisation, not the project. For example, “lack of user input” often occurs because users typically work on projects in addition to their normal duties. It is but natural that they will therefore view projects as  burdens rather than initiatives that might benefit them in the future. The fault here lies beyond the project. These kinds of issues need to be negotiated through open dialogue between all affected stakeholders rather than via top-down decrees .

Simplicio:  OK, I understand the importance of taking a system-based view, but what is “open dialogue”?

Salviati:   Ever worked for a team or organization where there are some things  that can never be discussed? Ever had bosses who only want to know the good news? Most projects have many different stakeholder groups, each with their own view of the project and motivations. Sponsors, managers, project teams and users – all have their own view on a project’s objectives. As strange as it may sound, these viewpoints are  often divergent, but are never reconciled until its too late. …

Simplicio:  [interrupting] That’s crazy! Why would project managers allow themselves to get into a situation where they are managing  projects in which  stakeholders hold different views on things like scope? That is completely against what “The Book” says! According to it, things such as scope  issues should not be ambiguous at all.

Salviati: Ah, now we get to the heart of the matter! Yes, it is crazy when you think about it, but we are dealing with office hierarchy and politics, as well individual rationality. Many organisations have a blame culture – and as a result, people tend to position themselves for blame avoidance. This creates all sorts of dysfunctional behaviours, and makes it very difficult to discuss things openly. The trick – and why you need to listed to the stories – is to break down these barriers so that a group can engage in open dialogue that will bring such issues out into the open. There are ways to do this, a couple of guys have even written a book on it. (Editor’s note: Perhaps he’s referring to this book?)

Simplicio: OK, I see your point, but what about the unknown unknowns – issues  that no one can foresee at the start.

Salviati:   That’s where trust comes in. The point is, if key stakeholders have a relationship based on trust, they will feel comfortable about informing each other of potential uncertainties as they emerge. They can then work together to address the uncertainty without the usual finger pointing and blame shifting that typically occurs in organisations. They will be no better than anyone else at predicting the future, but they will be able to deal with whatever comes up because they will face it as a group.

Simplicio: Sounds good, but how does one get stakeholders  to trust one another and discuss issues openly?

Salviati:  Well, as I mentioned earlier, much of present-day project management practice operates within a cause and effect paradigm…do this and that will happen. Instead the focus  ought to be on creating the right  conditions or environment in which a group of people can collaborate and work together as a genuine team.   There’s a ton of interesting work on this – some of it dating back to the 1950s

Simplicio: Why hasn’t anyone mentioned this in our discussion group? This is really important!

Salviati: The conditions over causes argument is yet to make an impact on mainstream practice – particularly in project management. Unfortunately,  those who wrote  the “The Book” (and those who update it) seem to  be unaware that conditions are more important than causes. It is a completely different way of looking at projects, so it may take a while for aficionados of “The Book” to make the change. That said, I’m an optimist so I believe that it  will eventually catch on; it is just a matter of time …

[ Salviati’s watch alarm goes off, cutting him off mid-sentence. He  glances at it]

Speaking of time, we’re all prisoners of time, it seems. I’ve got to go; I’m late for a meeting. We’ll continue our conversation later.

Simplicio: Thanks Salviati. I’d very much like that as I’m curious to hear more about your thoughts on this.

Salviati (turning to leave): Sure, I’ll be delighted to chat about it. Let’s meet on the weekend. Catch you later.

Simplicio: See you later.

[The two depart, going their separate ways]

—-

Postscript

metalogue is a real or imaginary conversation whose structure resembles the topic being discussed. This piece is inspired by Gregory Bateson’s metalogues in Part 1 of his book, Steps To an Ecology of Mind.

The characters in the above metalogue are borrowed from Galileo’s  Dialogue Concerning The Two Chief World Systems in which the character Salviati is a proponent of the Copernican “heresy” that the Earth is not at the centre of the universe whereas Simplicio favours the Geocentric view proposed by the Greek philosopher Ptolemy.

This post is a part of the first ever  #PMFlashBlog initiative which involves over 70 bloggers from  Australia, Canada, Colombia, Denmark, France, Italy, Mexico, Poland, Portugal, Singapore, South Africa, Spain, UK and the USA, all posting a piece on “What Project Means to Me” on their blogs @ 01:00 GMT on 25th September 2013. A complete list of participants can be found here

Acknowledgements

My thanks go out to Shim Marom for coming up with the wonderful idea of a project management flashblog  and for  the opportunity to participate in it.

I’m indebted to Paul Culmsee  for feedback on a draft version of this post and for countless conversations  over the years on  the philosophical and practical aspects of projects, organisations and systems.   Be sure to check out his blog, in particular his PMFlashBlog post which provides a practical (and very entertaining!) perspective on the “conditions over causes” principle mentioned in this metalogue.

Written by K